Resolve Blocked Stormwater lines which cause flooding
Excavated 25m and 1.5m Deep, Located defective section of pipe, removed defective pipework, laid new pipework through grass area and footpath, diverted line and connected downpipe to ensure water flow under heavy duress.
Grass area backfilled, levelled and returfed.
Used bitumen to repair footpath and compacted.